Bunker Delivery Note (BDN) and MARPOL Sample Checklist: What to Check Before You Sign (2026)
Most bunker disputes start with a document signed too fast. A practical checklist for chief engineers, operators and bunker suppliers: what must be on the BDN, how the MARPOL sample works, and where surveyors fit in.
Bunkering is one of the highest-value transactions in a port call, and one of the most disputed. Short delivery, off-spec fuel and missing paperwork are common, and most disputes could have been avoided at the moment the chief engineer signed the Bunker Delivery Note (BDN).
What the BDN is
Under MARPOL Annex VI, every delivery of fuel oil for combustion must come with a bunker delivery note from the supplier. The BDN records what was delivered and declares that the fuel meets the applicable sulphur limit. The ship must keep the BDN on board for at least three years.
BDN checklist: what must be on it
- Name and IMO number of the receiving ship
- Port and date of delivery (start of bunkering)
- Name, address and phone of the supplier
- Product name and quantity in metric tonnes
- Density at 15°C
- Sulphur content (% m/m)
- A signed supplier declaration that the fuel meets the relevant MARPOL limit
The global sulphur limit has been 0.50% since 1 January 2020, and 0.10% inside Emission Control Areas.
The MARPOL retained sample
Each delivery also needs a sealed, representative MARPOL sample, signed by the supplier's representative and the ship's officer. It is kept under the ship's control for at least 12 months, or until the fuel is substantially used, whichever is later. It is the sample an authority will test if there is doubt. Keep commercial samples separately; they are what you use for quality disputes with the supplier.
Quantity: check before you sign
- Take soundings and temperatures of the barge tanks before and after delivery, or check the meter readings.
- Correct volumes to 15°C using the declared density.
- Compare with the BDN quantity. If there is a shortfall, do not sign silently: sign with a remark and issue a letter of protest the same day.
An independent surveyor removes the argument; see bunker quantity surveys explained and types of marine surveyors.
Common problems
- BDN quantity higher than measured.
- Density or sulphur on the BDN not matching the lab result.
- Sample seals not recorded on the BDN.
- Pressure to sign quickly so the barge can leave.
For bunker suppliers and surveyors
Operators choose suppliers they trust at each port. Clean paperwork and fast, transparent deliveries win repeat orders. Make sure buyers can find you when they search a bunker hub; see the top 20 bunker hubs and why bunker suppliers list on PortServiceFinder. List your company free.
FAQ
Q: How long must a BDN be kept on board?
A: At least three years after delivery, under MARPOL Annex VI.
Q: How long is the MARPOL sample kept?
A: Under the ship's control for at least 12 months, or until the fuel is substantially consumed, whichever is longer.
Q: Should I sign a BDN if the quantity looks short?
A: Sign with a clear remark and issue a letter of protest; record soundings and get a surveyor if the amount is significant.